Skip to Main Content (Press Enter)

Logo UNIMORE
  • ×
  • Home
  • Degree programmes
  • Modules
  • Jobs
  • People
  • Research Outputs
  • Academic units
  • Third Mission
  • Projects
  • Skills

UNI-FIND
Logo UNIMORE

|

UNI-FIND

unimore.it
  • ×
  • Home
  • Degree programmes
  • Modules
  • Jobs
  • People
  • Research Outputs
  • Academic units
  • Third Mission
  • Projects
  • Skills
  1. Research Outputs

A new perspective on Workload Control by measuring operating performances through an economic valorization

Academic Article
Publication Date:
2022
Short description:
A new perspective on Workload Control by measuring operating performances through an economic valorization / Mezzogori, D.; Romagnoli, Giovanni; Zammori, F.. - In: SCIENTIFIC REPORTS. - ISSN 2045-2322. - 12:1(2022), pp. 1-17. [10.1038/s41598-022-17968-5]
abstract:
Workload Control (WLC) is a production planning and control system conceived to reduce queuing times of job-shop systems, and to offer a solution to the lead time syndrome; a critical issue that often bewilders make-to-order manufacturers. Nowadays, advantages of WLC are unanimously acknowledged, but real successful stories are still limited. This paper starts from the lack of a consistent way to assess performance of WLC, an important burden for its acceptance in the industry. As researchers often put more focus on the performance measures that better confirm their hypotheses, many measures, related to different WLC features, have emerged over years. However, this excess of measures may even mislead practitioners, in the evaluation of alternative production planning and control systems. To close this gap, we propose quantifying the main benefit of WLC in economic terms, as this is the easiest, and probably only way, to compare different and even conflicting performance measures. Costs and incomes are identified and used to develop an overall economic measure that can be used to evaluate, or even to fine tune, the operating features of WLC. The quality of our approach is finally demonstrated via simulation, considering the 6-machines job-shop scenario typically adopted as benchmark in technical literature.
Iris type:
Articolo su rivista
List of contributors:
Mezzogori, D.; Romagnoli, Giovanni; Zammori, F.
Authors of the University:
MEZZOGORI DAVIDE
Handle:
https://iris.unimore.it/handle/11380/1294707
Full Text:
https://iris.unimore.it//retrieve/handle/11380/1294707/477852/s41598-022-17968-5.pdf
Published in:
SCIENTIFIC REPORTS
Journal
  • Use of cookies

Powered by VIVO | Designed by Cineca | 26.4.4.0