JOBS PRE-ALLOCATION ON PARALLEL UNRELATED MACHINES WITH SEQUENCE DEPENDENT SETUP TIMES: EVIDENCE FROM A LARGE EXPERIMENTATION
Contributo in Atti di convegno
Data di Pubblicazione:
2014
Citazione:
JOBS PRE-ALLOCATION ON PARALLEL UNRELATED MACHINES WITH SEQUENCE DEPENDENT SETUP TIMES: EVIDENCE FROM A LARGE EXPERIMENTATION / Gamberini, Rita; Castagnetti, E.; Lolli, Francesco; Rimini, Bianca. - ELETTRONICO. - 19:(2014), pp. 4364-4369. ( The 19th World Congress of the International Federation of Automatic Control - Promoting automatic control for the benefit of humankind Cape Town - South Africa 24th-29th August 2014) [10.3182/20140824-6-za-1003.02824].
Abstract:
In this paper the problem of allocating and scheduling jobs on parallel unrelated machines is studied. Jobs are grouped in families of similar items. A sequence dependent setup is required between batches of jobs belonging to the same and different families, even if in the first case lower time is required. The size of batches is not known a-priori, hence the problem is divided in two different sub-problems: a) the allocation of volumes of work on each machine and b) subsequently the scheduling of
each item. The focus of the paper is on the first step and consequently on the pre-assignment problem. Three different solving approaches are implemented in several real-life case studies.
Tipologia CRIS:
Relazione in Atti di Convegno
Keywords:
Manufacturing line; scheduling; Parallel unrelated machines; Setup sequence-dependent
Elenco autori:
Gamberini, Rita; Castagnetti, E.; Lolli, Francesco; Rimini, Bianca
Link alla scheda completa:
Titolo del libro:
Proceedings of the the 19th World Congress of the International Federation of Automatic Control - Promoting automatic control for the benefit of humankind
Pubblicato in: